DPP Center

Everything you need to understand construction Digital Product Passports.

The EU ESPR and CPR are reshaping how construction products are documented and traded. This reference covers the regulations, standards, product family obligations, and technical concepts you need to prepare.

Regulations:ESPR 2024/1781CPR 2024/3110CBAMBuy Clean California

Key dates

Regulatory milestones at a glance.

ESPR and CPR are already in force. The product-specific DPP mandates arrive through harmonised standard (hEN) delegated acts — cement, structural steel, and precast concrete are the first wave, estimated Q4 2026.

Full regulatory timeline
Jun 2024CPR 2024/3110 entered into force
Aug 2024ESPR 2024/1781 entered into force
Q4 2026 est.Cement hEN delegated act — DPP mandatory
Q2 2028 est.Cement DPP obligation active (18 months after hEN)

Product families

Is your product in scope?

DPP obligations under ESPR are activated product-by-product through delegated acts referencing harmonised standards. The first construction product families in scope are those with existing CE marking under CPR.

See it in practice

View a live Digital Product Passport.

The Terrave demo DPP for TerraCem Low Carbon CEM III/B 32.5 N is publicly accessible. It includes all 13 EN 15804+A2 environmental indicators, a cryptographic signature, and a GS1 Digital Link QR code.